Project: Antony and Roderick House

Developer: Lambeth & Southwark Housing Association (LSHA)

Main Contractor: Adstone Construction

Utilities Value: £100,000

The Antony and Roderick House project involved the enhancement of two existing 1950s residential blocks, resulting in the creation of 30 additional affordable homes. Each home benefits from its own private amenity space, either a garden or a balcony. Careful planning ensured that the new structures had minimal impact on the external environment of the existing buildings and their residents. The project maintained harmony with the surrounding neighborhood by limiting the new buildings to five storeys, which is lower than many nearby urban blocks.

AIS Utilities’ Role

AIS Utilities was responsible for the design and installation of a new electricity connection, delivering 236KVA, including the successful implementation of a 500KVA substation. Our involvement ensured a seamless integration of power solutions for the development, contributing to the overall efficiency and sustainability of the project.

With our expertise, the project was completed on time and within budget, providing reliable utility infrastructure that supports the long-term needs of both the new and existing residents.

If you have challenges to overcome with the delivery of utilities on your project or you just want the job done right the first time with the stress taken away there’s only one company to trust and that’s AIS Utilities