Developer: Hub Residential

Main Contractor: JJR

Location: Maidenhead

Utility Value: 500K+

Project Highlights:

  • Full multi utility design of gas, electricity, and water
  • Over £100,000 saving on the utility quotations procured in stage 3.
  • Design Approval of non-standard substation solutions, overcoming issues with ventilation and access with liaison between multiple third parties.
  • Work carried out OOH with agreement from the council

Project Details:

  • Water mains and services coming from two separate points of connection.
  • Fitting of 429 internal meters
  • 2 X 63mm gas services for commercial units.
  • 4 x Integral substations for blocks A, B, D and E
  • Total electrical load: Circa 2.5 MVA

AIS Utilities are undertaking multi-utility connection works for this 155m scheme including the construction of the new substation to help re-generate maidenhead town centre.