Independent Connection Provider (ICP) Services by AIS Utilities

Welcome to AIS Utilities, your trusted partner for Independent Connection Provider (ICP) services. Our commitment to excellence and efficiency sets us apart in delivering seamless connections to the electricity grid. Let us guide you through Independent Connection Provider (ICP) services and how AIS Utilities can elevate your grid connection experience.

What is an Independent Connection Provider?

An Independent Connection Provider (ICP) operates under NERS accreditation, governed by the National Electricity Registration Scheme. At AIS Utilities, our ICP services adhere to the highest industry standards, ensuring that we only undertake projects within the scope of our NERS certification. Our team is fully qualified for diverse tasks, bringing expertise to every undertaking.

Who Can Benefit from Our ICP Services?

AIS Utilities extends its Independent Connection Provider (ICP) services to businesses across the UK seeking new connections to the electricity grid. We deliver end-to-end solutions for both contestable and non-contestable works, aligned to the specific requirements of your project and network operator.

Services offered by Independent Connection Providers

Design and Build

ICPs offer professional design services tailored to meet the unique requirements of each connection project. They assess the feasibility, evaluate technical specifications, and provide expert guidance throughout the design phase.

Project Management

ICPs manage the connection process, coordinating with energy suppliers, DNOs, local authorities, and other stakeholders. They handle all necessary paperwork, ensuring compliance with regulations and industry standards. Effective project management ensures timely and successful connection delivery.

Installation and Construction

ICPs have the expertise to install electricity, gas and water infrastructure physically. This involves laying cables, connecting equipment, and ensuring safe and reliable operation.

Testing and Commissioning

Before a connection is energized and handed over to the energy supplier, ICP conducts rigorous testing and commissioning porcedures to verify the integrity and performance of the infrastructure. They ensure compliance with all relevant safety standards and regulations.

Ongoing Support

ICPs provide continuing support, including maintenance, repairs, and upgrades to the connection infrastructure. They ensure the infrastructure remains efficient, reliable, and compliant throughout its operational life.

Utility Consultations

These include energy audits, utility cost analysis, infrastructure assessments, and utility procurement. Through meticulous energy audits, they identify areas of wastage and recommend strategies to minimize consumption while maximizing productivity.

What is the difference between ICPs and IDNOs?

Getting a new electricity connection in place usually starts with finding the right people to do the job. That’s where an Independent Connection Provider comes in. These providers are responsible for designing and building the actual electricity connection – whether it’s for a housing development, commercial site, or industrial unit. They don’t own the network they build (unless they’re also an IDNO), but they’re a popular choice for developers and businesses who want more control over timelines and costs. The table below breaks down how an Independent Connection Provider differs from an IDNO.

 

Role Independent Connection Provider (ICP) Independent Distribution Network Operator (IDNO)
What they do Designs and builds new electricity connections Owns and operates the electricity network
Builds the network? Yes No
Owns the network? No (unless also licensed as an IDNO) Yes
Ofgem regulated? No Yes
Who uses them? Property developers, contractors, businesses End users (via networks adopted from ICPs)
Where they operate Across the UK Across the UK (not tied to fixed regions like DNOs)

The Advantages of Choosing AIS Utilities

Greater Flexibility

Selecting AIS Utilities as your Independent Connection Provider ensures greater flexibility in project execution, allowing for tailored solutions that meet your specific requirements.

Cost Efficiency

Our ICP services are designed to be cost-efficient, providing optimal value for your investment while maintaining the highest quality standards.

Diverse Provider Options

With AIS Utilities, you gain access to a diverse range of providers, enabling you to choose the right fit for your project based on expertise, experience, and capabilities.

Project Timelines with AIS Utilities

The duration of your grid connection project with AIS Utilities depends on various factors, including the scope of services, the chosen ICP, and the size and location of the grid connection. Leveraging our expertise, we ensure timely delivery, with the added benefit of expedited timelines for contestable works.

Partnering with AIS Utilities

AIS Utilities proudly collaborates with Independent Distribution Network Operators (IDNOs) to offer comprehensive solutions for your grid connection needs. Our partnership with Vattenfall IDNO, a leading Independent Distribution Network Operator, further enhances the benefits we provide to our clients.
Discover the advantages of working with AIS Utilities and our commitment to delivering superior Independent Connection Provider services. Contact us to explore how we can contribute to the success of your grid connection project.

Frequently Asked Questions About ICP (Independent Connection Provider)

Who can carry out contestable works?2025-04-11T12:28:46+01:00
Contestable works can be completed by either an Independent Connection Provider (ICP) or an Independent Distribution Network Operator (IDNO).
What’s the difference between contestable and non-contestable works?2025-04-10T12:48:48+01:00

What’s the difference between contestable and non-contestable works?

When setting up a new electricity connection, especially through an Independent Connection Provider, it’s important to understand how the work is divided. Everything falls under two categories – contestable and non-contestable works – and knowing the difference helps you plan better, avoid delays, and stay on top of costs.

Contestable works are tasks that can be carried out by an Independent Connection Provider or, in some cases, an IDNO. These include the more practical parts of the connection process – like installing cables, substations, and managing the overall job. This flexibility is one of the reasons why many developers prefer going with an ICP, as it often speeds things up and gives them more control over how the project runs.

Non-contestable works are the parts that only the local DNO (Distribution Network Operator) is allowed to do. These involve more technical and safety-critical steps – things like approving designs, inspecting work, and making sure the final connection is safe and up to standard.

Here’s a quick look at how the two types of work break down:

Contestable works (handled by an Independent Connection Provider):

  • Sourcing and supplying materials

  • Cable laying and jointing

  • Substation installation

  • Installing ducting

  • Managing the full project

Non-contestable works (carried out by the DNO):

  • Approving the connection design

  • Testing and checking completed work

  • Identifying the point of connection

  • Charging admin fees for using the network

  • Servicing or repairing existing infrastructure

  • Making changes to the live network if needed

If you’re working with an Independent Connection Provider, they’ll handle all the contestable work and liaise with the DNO to get the non-contestable parts sorted. This clear division keeps things efficient and ensures the connection meets all required safety standards.

Can an ICP handle connection projects in remote or challenging locations?2025-04-08T11:34:32+01:00

Can an ICP handle connection projects in remote or challenging locations?

Yes, ICPs are experienced in managing connection projects in various environments, including remote or rugged areas. They have the expertise to navigate potential obstacles and find suitable solutions to connect your property to the electricity or gas grid, regardless of location.

Are ICPs responsible for obtaining necessary permits and permissions for the connection?2025-04-08T11:06:07+01:00

Are ICPs responsible for obtaining necessary permits and permissions for the connection?

Part of an ICP’s role is managing the connection process’s administrative aspects. This includes getting the required permits, licenses, and permissions from local authorities, DNOs, and other relevant parties. They will handle the necessary paperwork and ensure compliance with all regulatory requirements.

What are the typical costs of using an ICP for a connection project?2025-04-08T11:06:31+01:00

What are the typical costs of using an ICP for a connection project?

The prices can vary depending on the specific requirements of your project. Requesting a detailed quotation from an ICP outlining the design, installation, and connection charges is best. Comparing quotes from multiple ICPs can help you assess the cost-effectiveness of their services and choose the most suitable provider for your budget.

Can an ICP assist with both residential and commercial connection projects?2025-04-08T11:29:38+01:00

Can an ICP assist with both residential and commercial connection projects?

Yes, ICPs typically offer services for connection projects, including residential and commercial properties. Whether you need a new electricity or gas supply for your home, office, retail space, or industrial facility, an ICP can provide the necessary expertise and support.

How long does the connection process with an ICP usually take?2025-04-08T11:31:52+01:00

How long does the connection process with an ICP usually take?

The duration of the connection process can vary depending on factors such as the project’s complexity, site conditions, and the necessary approvals. However, ICPs often offer faster connection times than the traditional DNO route, aiming to expedite the process and minimize potential delays.

Are Independent Connection Providers regulated?2025-04-08T11:32:17+01:00

Are Independent Connection Providers regulated?

Independent Connection Providers operate under regulations and industry standards to ensure the connection infrastructure’s safety, reliability, and compliance. They must adhere to guidelines set by regulatory bodies and collaborate with DNOs and energy suppliers to meet all requirements.

How do I choose the right Independent Connection Provider for my project?2025-04-08T11:41:24+01:00

How do I choose the right Independent Connection Provider for my project?

When selecting an ICP, consider their experience, reputation, track record, customer reviews, pricing, and the range of services they offer. Finding an ICP that aligns with your specific project requirements and provides a high level of professionalism and expertise is essential.

Can I use an ICP for my connection or go through the DNO?2025-04-08T11:28:43+01:00

Can I use an ICP for my connection or go through the DNO?

While it is not mandatory to use an ICP, choosing to work with one offers advantages such as faster connection times and potential cost savings. It provides an alternative to the traditional DNO route, allowing you to explore other options and benefit from specialized services.

How does using an ICP benefit me as a consumer or business owner?2025-04-08T11:28:20+01:00

How does using an ICP benefit me as a consumer or business owner?

Engaging an ICP provides several benefits, including faster connection times, cost-effectiveness, specialized expertise, flexibility in choosing a provider, and tailored solutions to your specific connection needs.

What is the role of an Independent Connection Provider (ICP)?2025-04-08T11:40:55+01:00

What is the role of an Independent Connection Provider (ICP)?

An ICP is a specialist intermediary between energy suppliers, distribution network operators (DNOs), and consumers. They are responsible for designing, installing, and connecting electricity and gas infrastructure, offering an alternative to using the DNO for new connections.

Why Choose AIS for Utility Connections in London?

  • London Expertise: In-depth knowledge of local regulations and infrastructure
  • Efficiency: Swift connections to keep your London projects on schedule
  • Customer-Centric: Exceptional service, changing perceptions of utility providers in London
  • Cost-Effective: Competitive pricing for London utility connections
  • Comprehensive Solutions: Multi-utility approach for all your London connection needs
Go to Top